time for another update...
I had the st170 sump powder coated and bolted on
i put the flywheel on, its an rs turbo 220mm item, i had to drill the flywheel bolt holes out by 0.5mm to 11mm..
...with an AP cerametallic clutch
Then i moved onto building the Stg3 Big Valve cylinder head up..
nice big stainless valves, brandnew rockers, collets and aluminium valve spring retainers
this was the engine in the stand, i timed the Piper285t2 cam up using the vernier, sorted out a few bits and bobs and got it ready for installing into my Escort . . .
which is what i did today ->
engine installed on its mounts..
hope to have it ready to run soon